Pelham
UnknownNGETNGET400 kV
Site Summary
Voltage Levels
1
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NGET
Generation Connection Queue
Embedded Capacity Register + NESO TEC1.8 GW
Queued
0.0 MW
Connected
4
Projects
| Project | Technology | Capacity | Status |
|---|---|---|---|
| Pelham Farm 2 | Energy Storage System;PV Array (Photo Voltaic/solar) | 700.0 MW | Scoping |
| Pelham GEC (Ethos Green) | Demand;Energy Storage System;Reactive Compensation | 480.0 MW | Awaiting Consents |
| Pelham 400 | Energy Storage System;PV Array (Photo Voltaic/solar) | 400.0 MW | Scoping |
| Pelham BESS | Energy Storage System | 249.9 MW | Scoping |
Voltage Levels (1)
Data Source
Primary DNO:NGET
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.