Ninfield
BSPUKPNNGET400 kV 132 kV
Site Summary
Voltage Levels
2
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NGET, UKPN
Generation Connection Queue
Embedded Capacity Register + NESO TEC2.2 GW
Queued
0.0 MW
Connected
15
Projects
| Project | Technology | Capacity | Status |
|---|---|---|---|
| Ninfield Green Energy Centre | Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | 600.0 MW | Awaiting Consents |
| Catsfield | Energy Storage System | 240.0 MW | Scoping |
| MAS 001 Limited | Storage - Electrochemical (Batteries) | 240.0 MW | Accepted to Connect |
| Ninfield BESS | Energy Storage System | 225.0 MW | Scoping |
| TH Ninfield | Energy Storage System | 200.0 MW | Scoping |
| ELGIN ENERGY ESCO LTD | Storage - Electrochemical (Batteries) | 130.0 MW | Accepted to Connect |
| Saver & Pashley Farm Energy Park | Energy Storage System;PV Array (Photo Voltaic/solar) | 129.9 MW | Scoping |
| Elgin Energy Esco | Storage - Electrochemical (Batteries) | 99.9 MW | Accepted to Connect |
| BALANCE ENERGY 24 LTD | Storage - Electrochemical (Batteries) | 99.0 MW | Accepted to Connect |
| EEB109 Limited | Photovoltaic | 75.0 MW | Accepted to Connect |
| Trina Solar | Storage - Electrochemical (Batteries) | 50.0 MW | Accepted to Connect |
| BRS APPLICATIONS LTD | Storage - Electrochemical (Batteries) | 49.9 MW | Accepted to Connect |
| RWE Renewables UK Solar And Storage Limited | Photovoltaic | 48.5 MW | Accepted to Connect |
| BSR Applications Limited | Storage - Electrochemical (Batteries) | 10.0 MW | Accepted to Connect |
| Ninfield Greener Grid Park | Energy Storage System;Reactive Compensation | — | Awaiting Consents |
Voltage Levels (2)
400kV
1 busbarData Source
Primary DNO:UK Power Networks
License:OGL v3