Keadby
UnknownNGETNGET400 kV
Site Summary
Voltage Levels
1
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NGET
Generation Connection Queue
Embedded Capacity Register + NESO TEC9.7 GW
Queued
0.0 MW
Connected
11
Projects
| Project | Technology | Capacity | Status |
|---|---|---|---|
| Bute Hydrogen Project 1 | CCGT (Combined Cycle Gas Turbine) | 4800.0 MW | Scoping |
| Keadby | CCGT (Combined Cycle Gas Turbine) | 910.0 MW | Built |
| Keadby South Power Station | CCGT (Combined Cycle Gas Turbine) | 910.0 MW | Built |
| Keadby II | CCGT (Combined Cycle Gas Turbine) | 893.0 MW | Built |
| Keadby North Power Station | CCGT (Combined Cycle Gas Turbine) | 892.0 MW | Awaiting Consents |
| Killingholme Energy Park | Energy Storage System;PV Array (Photo Voltaic/solar) | 500.0 MW | Scoping |
| Keadby | Energy Storage System | 250.0 MW | Scoping |
| CRT Keadby 2 | Energy Storage System | 240.0 MW | Scoping |
| Epworth PV & BESS Station | Energy Storage System;PV Array (Photo Voltaic/solar) | 150.0 MW | Scoping |
| Brigg | CCGT (Combined Cycle Gas Turbine) | 99.0 MW | Built |
| Glanford | Biomass | 15.0 MW | Built |
Voltage Levels (1)
Data Source
Primary DNO:NGET
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.