Grimsby West
BSPNPGNGET400 kV 132 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC8.3 GW
Queued
130 MW
Connected
27
Projects
| Project | Technology | Capacity | Status |
|---|---|---|---|
| Bute Hydrogen Project 3 | CCGT (Combined Cycle Gas Turbine) | 3600.0 MW | Scoping |
| STALLINGBOROUGH CARBON CAPTURE CCGT | CCGT (Combined Cycle Gas Turbine);Demand | 906.0 MW | Scoping |
| Carbon Free 2030 | Energy Storage System;PV Array (Photo Voltaic/solar) | 500.0 MW | Scoping |
| Grimsby BESS | Energy Storage System | 500.0 MW | Scoping |
| Stallingborough PV & BESS Station | Energy Storage System;PV Array (Photo Voltaic/solar) | 500.0 MW | Scoping |
| Great Coates BESS | Energy Storage System | 300.0 MW | Scoping |
| EcoGrimsbyWest | Energy Storage System;PV Array (Photo Voltaic/solar) | 249.0 MW | Scoping |
| Butt Lane - Grimsby BESS | Energy Storage System | 240.0 MW | Scoping |
| Butt Lane BESS | Storage - Electrochemical (Batteries) | 240.0 MW | Accepted To Connect |
| Ludborough 2 PV | Photovoltaic | 180.0 MW | Accepted To Connect |
| North Ray Solar Farm 2 | PV Array (Photo Voltaic/solar) | 180.0 MW | Scoping |
| West Grimsby Farm | PV Array (Photo Voltaic/solar) | 150.0 MW | Awaiting Consents |
| West Grimsby Farm | Photovoltaic | 150.0 MW | Accepted To Connect |
| Little Becks Solar, Wind and Storage | Photovoltaic | 99.9 MW | Accepted To Connect |
| BSB Transport BESS | Storage - Electrochemical (Batteries) | 80.0 MW | Connected |
| Econergy | Storage - Electrochemical (Batteries) | 80.0 MW | Accepted To Connect |
| NEL Immingham BESS | Storage - Electrochemical (Batteries) | 80.0 MW | Accepted To Connect |
| Weelsby Farm | Photovoltaic | 65.0 MW | Accepted To Connect |
| Netherlands Way Gas | Engine (combustion / reciprocating) | 60.0 MW | Accepted To Connect |
| Brocklesby | Photovoltaic | 50.0 MW | Accepted To Connect |
Showing top 20 by capacity — 7 more not shown.
Voltage Levels (4)
400kV
1 busbar132kV
1 busbarData Source
Primary DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.