Ferrybridge A
BSPNPGNGET400 kV 132 kV 66 kV +1 more
Generation Connection Queue
Embedded Capacity Register + NESO TEC1.9 GW
Queued
99 MW
Connected
27
Projects
| Project | Technology | Capacity | Status |
|---|---|---|---|
| Bluebell Battery Bank | Storage - Electrochemical (Batteries) | 240.0 MW | Accepted To Connect |
| NEL Conway2 BESS | Storage - Electrochemical (Batteries) | 240.0 MW | Accepted To Connect |
| NEL Springfield | Storage - Electrochemical (Batteries) | 240.0 MW | Accepted To Connect |
| 200MW BESS at Land to West of Stocking Lane | Storage - Electrochemical (Batteries) | 200.0 MW | Accepted To Connect |
| NEL Hunter | Storage - Electrochemical (Batteries) | 200.0 MW | Accepted To Connect |
| Fryston Lane BESS | Storage - Electrochemical (Batteries) | 100.0 MW | Accepted To Connect |
| Ferrybridge BESS | Storage - Electrochemical (Batteries) | 94.9 MW | Accepted To Connect |
| Ferrybridge Multi-Fuel 1 | Steam turbine (thermal power plant) | 82.0 MW | Connected |
| Elawan Energy BESS Whinmoor | Storage - Electrochemical (Batteries) | 80.0 MW | Accepted To Connect |
| Sunny Dairy Farm Energy Park | Storage - Electrochemical (Batteries) | 70.0 MW | Accepted To Connect |
| Hayton House Farm | Photovoltaic | 53.4 MW | Accepted To Connect |
| Cawood Hybrid | Photovoltaic | 52.0 MW | Accepted To Connect |
| Cooklands Farm | Storage - Electrochemical (Batteries) | 50.0 MW | Accepted To Connect |
| Holmfield Lane BESS | Storage - Electrochemical (Batteries) | 50.0 MW | Accepted To Connect |
| Hillam Solar Farm | Photovoltaic | 50.0 MW | Accepted To Connect |
| Ledston BESS | Storage - Electrochemical (Batteries) | 49.9 MW | Accepted To Connect |
| Scalm Park | Photovoltaic | 49.9 MW | Accepted To Connect |
| Ardagh Glass Solar | Photovoltaic | 40.0 MW | Accepted To Connect |
| Barnsdale PV | Photovoltaic | 40.0 MW | Accepted To Connect |
| WF4 Manor Farm PV | Photovoltaic | 30.0 MW | Accepted To Connect |
Showing top 20 by capacity — 7 more not shown.
Capacity Forecast
NPG Network Development Plan (demand) · NPG Network Development Plan (generation) · 2026–2050
Ferrybridge A 11kV 11 kV
Electric Engagement Hydrogen Evolution Holistic Transition
Source: NPG Network Development Plan (demand) · NPG Network Development Plan (generation). Generation headroom across mixed-tech datasets is reported as the worst-case (gating) value when both inverter-based and synchronous figures are available.
Voltage Levels (7)
400kV
2 busbars132kV
1 busbar66kV
2 busbars11kV
1 busbarData Source
Primary DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.