Enderby

BSPNGEDNGET400 kV 132 kV

Location

Loading map...
Coordinates

52.597260, -1.215480

From DNO data
Get Directions

Site Summary

Voltage Levels

2

Best Gen RAG
unknown
Best Gen Headroom

N/A

Best Demand Headroom

N/A

Operators

NGED, NGET

Generation Connection Queue

Embedded Capacity Register + NESO TEC
2.9 GW
Queued
0.0 MW
Connected
16
Projects
ProjectTechnologyCapacityStatus
Enderby Green Energy CentreEnergy Storage System;PV Array (Photo Voltaic/solar)1025.0 MWAwaiting Consents
Rugby High Impact Green Energy Hub (HIGEH) 1Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore1000.0 MWScoping
Enderby Solar & BESSEnergy Storage System;PV Array (Photo Voltaic/solar)500.0 MWScoping
Enderby (Akira)Energy Storage System57.0 MWBuilt
Enderby TertiaryPV Array (Photo Voltaic/solar)57.0 MWScoping
BESS at HINC1_303 (Site 97)BESS49.9 MWAccepted not yet Connected
Solar at HINC1_303 (Site 97)Solar49.9 MWAccepted not yet Connected
Solar at KIBW1_205 (Site 544)Solar49.9 MWAccepted not yet Connected
Solar at ENDE1_MAIN1 (Site 585)Solar40.0 MWAccepted not yet Connected
Solar at KIBW1_105 (Site 652)Solar40.0 MWAccepted not yet Connected
Solar at COVI3_MAIN1 (Site 561)Solar30.0 MWAccepted not yet Connected
BESS at THUN3_T2 (Site 567)BESS21.0 MWAccepted not yet Connected
Solar at BAGR3T (Site 287)Solar18.0 MWAccepted not yet Connected
Solar at BARD5_MAIN1 (Site 562)Solar6.0 MWAccepted not yet Connected
Solar at ALLL5_MAIN1 (Site 36)Solar1.9 MWAccepted not yet Connected
Solar at PEPS9GEN (Site 95)Solar1.9 MWAccepted not yet Connected

Voltage Levels (2)

400kV

1 busbar
EnderbyNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

132kV

1 busbar
Enderby 132kVNGED
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

Data Source

Primary DNO:National Grid Electricity Distribution
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.