East Claydon

BSPNGEDNGET400 kV 132 kV 33 kV

Location

Loading map...
Coordinates

51.925790, -0.905650

From DNO data
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

N/A

Best Demand Headroom

N/A

Operators

NGED, NGET

Generation Connection Queue

Embedded Capacity Register + NESO TEC
4.8 GW
Queued
32 MW
Connected
27
Projects
ProjectTechnologyCapacityStatus
East Claydon Green Energy CentreDemand;Energy Storage System;PV Array (Photo Voltaic/solar)1025.0 MWAwaiting Consents
East Claydon High Impact Green Energy Hub (HIGEH) 1Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore1000.0 MWScoping
East Claydon Greener Grid ParkEnergy Storage System650.0 MWScoping
East Claydon Solar PVEnergy Storage System500.0 MWScoping
RosefieldEnergy Storage System;PV Array (Photo Voltaic/solar)500.0 MWAwaiting Consents
Alderton PV & BESS StationEnergy Storage System;PV Array (Photo Voltaic/solar)450.0 MWScoping
Solar at BRKL1_103 (Site 26)Solar129.9 MWAccepted not yet Connected
BESS at BRKL1Q (Site 421)BESS49.9 MWAccepted not yet Connected
Solar at BLET1_MAIN3 (Site 60)Solar49.9 MWAccepted not yet Connected
Solar at BRKL1Q (Site 422)Solar49.9 MWAccepted not yet Connected
Solar at ECLA1_MAIN1 (Site 249)Solar49.9 MWAccepted not yet Connected
Solar at STOS1_103A (Site 195)Solar49.9 MWAccepted not yet Connected
Solar at BANB1_MAIN4 (Site 580)Solar40.0 MWAccepted not yet Connected
Solar at BLET1_203 (Site 219)Solar40.0 MWAccepted not yet Connected
Solar at BRAA3_MAIN2 (Site 495)Solar40.0 MWAccepted not yet Connected
Solar at BRKL3_MAIN1 (Site 414)Solar30.0 MWAccepted not yet Connected
Solar at STOS3_MAIN3 (Site 412)Solar25.0 MWAccepted not yet Connected
Solar at SILV3_T1 (Site 73)Solar22.0 MWAccepted not yet Connected
Solar at TATE3_#2L5 (Site 463)Solar22.0 MWAccepted not yet Connected
Solar at BRKL3_MAIN2 (Site 127)Solar20.0 MWAccepted not yet Connected
Showing top 20 by capacity — 7 more not shown.

Voltage Levels (3)

400kV

1 busbar
East ClaydonNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

132kV

1 busbar
East Claydon 132kVNGED
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

33kV

1 busbar
East Claydon 33kVNGED
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

Data Source

Primary DNO:National Grid Electricity Distribution
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.