Carrington

PrimarySPENNGET400 kV 132 kV 33 kV

Location

Loading map...
Coordinates

53.436010, -2.405730

From DNO data
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

N/A

Best Demand Headroom

N/A

Operators

ENW, NGET, SPEN

Generation Connection Queue

Embedded Capacity Register + NESO TEC
2.1 GW
Queued
80 MW
Connected
17
Projects
ProjectTechnologyCapacityStatus
Trafford 2 BESSEnergy Storage System1400.0 MWScoping
CarringtonCCGT (Combined Cycle Gas Turbine)680.0 MWConsents Approved
CarringtonEnergy Storage System57.0 MWAwaiting Consents
CARRINGTON GENERATION LTDENGINE (COMBUSTION / RECIPROCATING)40.0 MWCONNECTED
UK POWER RESERVE PEELENGINE (COMBUSTION / RECIPROCATING)20.0 MWCONNECTED
UK POWER RESERVE MARTENS ROADENGINE (COMBUSTION / RECIPROCATING)18.0 MWCONNECTED
RENEWABLES FIRST LTDHYDRO - RUN OF RIVER1.4 MWCONNECTED
synth-m31-4tg-air-productsFOSSIL - OIL0.3 MWCONNECTED
synth-m44-6bd-the-winery-fairhills-rd-irlamSOLAR0.3 MWCONNECTED
GEO GREEN POWER LTDPHOTOVOLTAIC0.2 MWACCEPTED TO CONNECT
THE LOW CARBON ENERGY COMPANYPHOTOVOLTIAC0.2 MWACCEPTED TO CONNECT
UNITED UTILITIES, IRLAM RD, URMSTONSOLAR0.2 MWACCEPTED TO CONNECT
SAVILLS ENERGYSOLAR0.2 MWCONNECTED
BARKER ASSOCIATESPHOTOVOLTIAC0.1 MWACCEPTED TO CONNECT
synth-m31-4bx-linco-house-manchester-road-carringtonSOLAR0.1 MWCONNECTED
SALFORD COUNCILSOLAR0.1 MWCONNECTED
Cryogenic Battery System (Synchronous)Energy Storage System;Reactive CompensationUnder Construction/Commissioning

Voltage Levels (3)

400kV

1 busbar
CarringtonNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

132kV

1 busbar
CarringtonSPEN
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

33kV

1 busbar
Carrington 33kVENW
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

Data Source

Primary DNO:SP Energy Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.