Blackhillock
GSPSSEN_TXSSEN_TX275 kV
Site Summary
Voltage Levels
1
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
SSEN_TX
Generation Connection Queue
Embedded Capacity Register + NESO TEC3.9 GW
Queued
0.0 MW
Connected
8
Projects
| Project | Technology | Capacity | Status |
|---|---|---|---|
| ARVEN OFFSHORE WIND FARM | Wind Offshore | 1800.0 MW | Scoping |
| Dorenell Windfarm Extension | Wind Onshore | 610.0 MW | Scoping |
| Keith BESS Station | Energy Storage System | 400.0 MW | Scoping |
| Blackhillock Battery | Energy Storage System | 349.0 MW | Scoping |
| Longmorn Energy Park | Energy Storage System;PV Array (Photo Voltaic/solar) | 300.0 MW | Scoping |
| Zenobe Blackhillock 300 MW | Energy Storage System | 200.0 MW | Built |
| Kedrum Solar Farm | Energy Storage System;PV Array (Photo Voltaic/solar) | 150.0 MW | Scoping |
| Teindland Wind Farm | Demand;Wind Onshore | 112.2 MW | Scoping |
Voltage Levels (1)
Data Source
Primary DNO:SSEN_TX
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.